الوصف
After repaving a section of Water St (great job!), the contractor left a large pile of asphalt on the side of the road. All heavy equipment has been taken away.
After repaving a section of Water St (great job!), the contractor left a large pile of asphalt on the side of the road. All heavy equipment has been taken away.
3 تعليقs
مغلق Wes (مستخدم مسجل)
angelibruck@aol.com (مستخدم مسجل)
Department of Public Works (تم التحقق رسميا)