Description
After repaving a section of Water St (great job!), the contractor left a large pile of asphalt on the side of the road. All heavy equipment has been taken away.
After repaving a section of Water St (great job!), the contractor left a large pile of asphalt on the side of the road. All heavy equipment has been taken away.
3 Comments
Closed Wes (Registered User)
angelibruck@aol.com (Registered User)
Department of Public Works (Verified Official)